Quite a lot achieved this morning with a team of 8. Osteospurmums were popped into the Station Roundabout to replace those lost in winter, then we started painting the metal barriers that are bolted on top of the mural walls. They were last painted in 2018 so it was time for a freshen up. The next step will be grey wall coping which will be done on Thursday. Fabulous weather. Well done team.
PS. The Beschorneria yuccoides has 4 flower stems now and the green flower heads are bursting through. What an incredible plant.