Having told us last year, that a full size door had to be cut into the mural, the goalposts have been moved this year yet again!!!! South West Water have now requested a path from their Emergency Exit from the Sewage Pumping Station ( through the mural ) over the Swan display planting. So having been donated some suitable pavers the job was completed today. Great work and big thanks Dave G.
The path will be hardly noticable from the front of the Swan once the plants have grown up a bit.